Mount
Pleasant, DC - Master Bathroom

Brief Explanation of the Scope of Work
These homeowners came to us
after a failed attempt at a do-it-themselves master
bathroom. Before realizing that they were in over their
head, they had purchased thousands of dollars of materials
based upon an incomplete sketch and had gutted their
bathroom. We redesigned and built their master bathroom.
Unusual Constraints/Challenges and Creative Solutions
The homeowners had a
few requirements for this project. They wanted us
to work with the materials they had
on hand. They wanted a convenient laundry closet so
they wouldn’t have to travel far from their bedroom
to do laundry. Generally, they wanted a comfortable,
contemporary and unique bathroom.
We utilized their materials
in a novel and thoughtful manner. The design flowed
out of an organic consideration
of the supplied materials. These included a whirlpool
tub, ½” and 6” limestone tiles,
steam shower and shower plumbing equipment as well
as a custom double vanity, sinks and faucets. The curve
of the whirlpool tub became a design cornerstone of
sorts. We built a tub deck/apron with a curve to match
the tub’s shape and carefully finished them with ½” mosaic
limestone tiles. The wall tile curve progresses in
a regular wave around the room from the curved ceiling
of the steam shower to far end of the vanity. Other
corresponding design elements include the shower seat
and two curving bumps in the stone counters of the
vanity.
The existing bulkhead
above the new vanity location couldn’t easily be moved because it housed ducting.
To solve this problem we extended it around over and
across the vanity and whirlpool and used it to house
recessed lights (See picture below). These two-level
curves, accented by lights, create a complex elevation
that met the customers’ desire for a unique and
contemporary bathroom sanctuary.
The homeowners had a
particular bathroom entry door in mind so we it in
with a transom with casing to match.
The plumbing was particularly challenging, not only
because we had to install a massive amount of plumbing
in the small space of the shower wall, but also because
the homeowners were re-plumbing the rest of the house
with their plumber and we fell into managing this plumber’s
work to ensure it wouldn’t adversely affect ours.
The curving tile was an obvious challenge. Painting
is a faux finish, though this was contracted directly
by the homeowner.
Overall Results
These clients were so pleased with the end results that a couple of years later, they hired us again to re-build an old, crumbling, and structurally unsafe two-story screened porch in the back of their house, needless to say..., it was again, a complete success. To read and view images of that project, click here.
|